• APM2.5 2.6 2.8 pixhawk Current Meter BEC Power Supply Module Distribution Board 3 in 1 for Multicopter Flight Control
  • APM2.5 2.6 2.8 pixhawk Current Meter BEC Power Supply Module Distribution Board 3 in 1 for Multicopter Flight Control
  • APM2.5 2.6 2.8 pixhawk Current Meter BEC Power Supply Module Distribution Board 3 in 1 for Multicopter Flight Control

APM2.5 2.6 2.8 pixhawk Current Meter BEC Power Supply Module Distribution Board 3 in 1 for Multicopter Flight Control

Availability: In stock, usually dispatched in 1 business day

  • Price:$12.20
  • Price in reward points: 122 Reward Points: 1
  • Quantity 3+ units 10+ units 30+ units 50+ units More
    Price /Unit $11.96 $11.71 $11.35 $10.86 Contact US
Quantity:

APM2.5 2.6 2.8 pixhawk Current Meter BEC Power Supply Module Distribution Board 3 in 1 for Multicopter Flight Control

Description:

- This is APM current voltage sensor, combining current meter, UBEC, power distribution board three functions together.
- Compatible with APM2.5/APM2.6/APM2.8/PX4 flight controller.
- PCB adopts two sides copper gold techonology, stable and reliable current
- Onboard 5.3V/ 3A switch UBEC power supply
- Adopting three tantalum capacitors, gurantee stable APM power supply
- Current voltage sampling circuit is compatible with 3DR current meter, no need calibration

Parameters:
- Size: 50*50mm
- Install hole distance: 45*45mm
- Output distribution cable: 6 channel
- Voltage input: 2-6S
- Voltage sammpling: 10/ 1
- BEC output: 5.3V/ 3A

Package includes:
- 3 in 1 current meter board x 1
- 14AWG red silicon soft cable x 1
- 14AWG black silicon soft cable x 1
- XT60 battery connection plug x 1 pair
- 6PIN power supply signal cable x 1
- Shrinkable tube x 1

Note:
- T plug is not stable enough, so the current meter is not with T plug,
- Current meter is not welded on XT6 and SR wires
- When you welding XT60 interface and power distribution board, please make sure to use large power soldering iron and soldering tin.
- Recommend to use 100W soldering iron
- Compatible with standard version APM, please note the line sequence of APM and power distribution board when you connecting cables
 

Write a review

Note: We will keep it confidential.
Note: HTML is not translated!
 
Captcha